IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,736

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0030 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,268 $11,600 Not Implemented
BS0030 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,073 $23,840 Not Implemented
BS0030 # 04 Y:2014 04 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,459 $2,500 Not Implemented
OR0627 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $28,066 $0 Implemented
OR0627 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $54,087 $0 Implemented
OR0627 # 03 Y:2014 03 2014 CHANGE OPERATING CONDITIONS $30,875 $0 Implemented
OR0627 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,799 $1,000 Implemented
OR0627 # 05 Y:2014 05 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $21,245 $23,300 Not Implemented
OR0627 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,770 $22,011 Not Implemented
OR0627 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $10,323 $17,350 Implemented
OR0627 # 08 Y:2014 08 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,937 $129,750 Not Implemented
OR0627 # 09 Y:2014 09 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,631 $4,602 Not Implemented
OR0627 # 10 Y:2014 10 2014 USE PHOTOCELL CONTROLS $3,741 $7,191 Implemented
OR0627 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,856 $39,597 Implemented
OR0624 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $8,251 $22,500 Not Implemented
OR0624 # 02 Y:2014 02 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,193 $468 Not Implemented
OR0624 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $12,766 $6,839 Implemented
OR0624 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,361 $30,178 Implemented
BS0025 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,335 $1,104 Not Implemented
BS0025 # 02 Y:2013 02 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,537 $6,138 Not Implemented
BS0025 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $626 $495 Not Implemented
BS0025 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $208 $1,211 Not Implemented
BS0025 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $444 $15 Not Implemented
BS0025 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $829 $977 Not Implemented
OR0621 # 01 Y:2013 01 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $1,962 $2,256 Not Implemented