IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0398 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $12,184 $12,000 Implemented
OR0398 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,080 $37,263 Implemented
OR0398 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $799 $800 Implemented
IA0281 # 01 Y:2001 01 2001 UPGRADE OBSOLETE EQUIPMENT $1,996,394 $28,500 Not Implemented
IA0281 # 02 Y:2001 02 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $38,729 $1,405 Not Implemented
IA0281 # 03 Y:2001 03 2001 USE POWER DURING OFF-PEAK PERIODS $8,860 $0 Not Implemented
IA0281 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,217 $1,280 Not Implemented
IA0281 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,253 $1,301 Implemented
IA0281 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,547 $27 Not Implemented
IA0281 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,408 $0 Implemented
IA0281 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $812 $1,460 Not Implemented
IA0280 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,114 $0 Not Implemented
IA0280 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,020 $0 Not Implemented
IA0280 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $845 $668 Not Implemented
IA0280 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $604 $1,592 Not Implemented
IA0280 # 05 Y:2001 05 2001 REPAIR OR REPLACE STEAM TRAPS $87,600 $7,916 Implemented
IA0280 # 06 Y:2001 06 2001 REPAIR AND ELIMINATE STEAM LEAKS $25,698 $10,330 Implemented
IA0280 # 07 Y:2001 07 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $4,493 $7,500 Not Implemented
IA0280 # 08 Y:2001 08 2001 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,473 $10,000 Not Implemented
LL0113 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $1,924 $1,802 Not Implemented
LL0113 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $13,907 $845 Not Implemented
LL0113 # 03 Y:2001 03 2001 USE OPTIMUM THICKNESS INSULATION $62,646 $51,608 Not Implemented
LL0113 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,727 $12,240 Not Implemented
LL0113 # 05 Y:2001 05 2001 USE PHOTOCELL CONTROLS $1,979 $203 Not Implemented
AS0312 # 01 Y:2001 01 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $95 $20 Implemented