IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0181 # 10 Y:2016 10 2016 OPTIMIZE PLANT POWER FACTOR $3,012 $8,000 Implemented
CO0735 # 01 Y:2016 01 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,910 $31,560 n/a
CO0735 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,020 $13,690 n/a
CO0735 # 03 Y:2016 03 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $2,820 $14,180 n/a
CO0735 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,500 $1,860 n/a
IA0565 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,062 $60,264 Not Implemented
IA0565 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $3,083 $5,550 Not Implemented
IA0565 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,616 $5,218 Not Implemented
IA0565 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,371 $500 Implemented
IA0565 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,846 $2,352 Implemented
IA0565 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,529 $165 Implemented
IA0565 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,046 $70 Implemented
CO0734 # 01 Y:2016 01 2016 REDESIGN PROCESS $69,240 $103,200 n/a
CO0734 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,460 $2,220 n/a
CO0734 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,110 $570 n/a
CO0734 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $4,560 $3,590 n/a
CO0734 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,330 $46,120 n/a
WV0536 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,902 $82,500 Not Implemented
WV0536 # 02 Y:2016 02 2016 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $8,800 $31,000 Not Implemented
WV0536 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,788 $1,000 Implemented
WV0536 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,983 $2,015 Implemented
WV0536 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $2,250 Implemented
WV0536 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,406 $617 Implemented
WV0536 # 07 Y:2016 07 2016 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $735 $4,320 Implemented
WV0536 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $60 Not Implemented