Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0336 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $640 | $800 | Not Implemented |
AM0336 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $600 | $100 | Implemented |
AM0336 # 05 Y:1999 | 05 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $460 | $0 | Not Implemented |
AM0336 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $290 | $14 | Not Implemented |
AM0336 # 07 Y:1999 | 07 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $135 | $0 | Not Implemented |
TN0647 # 01 Y:1999 | 01 | 1999 | MAKE A NEW BY-PRODUCT | $754,000 | $1,851,360 | Not Implemented |
TN0647 # 02 Y:1999 | 02 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $339,565 | $329,440 | Not Implemented |
TN0647 # 03 Y:1999 | 03 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $21,000 | $16,000 | Not Implemented |
TN0647 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,040 | $500 | Not Implemented |
TN0647 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $0 | Implemented |
OR0337 # 01 Y:1999 | 01 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $44,432 | $21,400 | Not Implemented |
OR0337 # 02 Y:1999 | 02 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,060 | $0 | Implemented |
OR0337 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $9,949 | $13,663 | Implemented |
OR0337 # 04 Y:1999 | 04 | 1999 | USE LESS WASTEFUL PACKAGING | $34,000 | $73,000 | Not Implemented |
OR0337 # 05 Y:1999 | 05 | 1999 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $11,000 | $28,700 | Implemented |
OR0338 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $14,000 | $1,630 | Implemented |
OR0338 # 02 Y:1999 | 02 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $229,748 | $79,349 | Not Implemented |
OR0338 # 03 Y:1999 | 03 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $6,574 | $15,045 | Not Implemented |
OR0338 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $9,244 | $1,831 | Not Implemented |
OR0338 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,400 | $12,250 | Not Implemented |
OR0338 # 06 Y:1999 | 06 | 1999 | USE OPTIMUM THICKNESS INSULATION | $1,900 | $1,810 | Not Implemented |
ME0256 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,108 | $11,800 | Not Implemented |
ME0256 # 02 Y:1999 | 02 | 1999 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,700 | $900 | Implemented |
ME0256 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,563 | $2,500 | Implemented |
ME0256 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $512 | $185 | Implemented |