Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0234 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,187 | $15,000 | Not Implemented |
TT0234 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,742 | $3,800 | Not Implemented |
TT0234 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,207 | $3,000 | Not Implemented |
TT0234 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,041 | $3,675 | Not Implemented |
TT0232 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,442 | $48,190 | Not Implemented |
TT0232 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $22,260 | $107,529 | Implemented |
TT0232 # 03 Y:2019 | 03 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $9,856 | $40 | Not Implemented |
TT0232 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,941 | $22,500 | Not Implemented |
TT0232 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,375 | $3,375 | Not Implemented |
TT0232 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $1,339 | $1,060 | Not Implemented |
TT0231 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,957 | $153,710 | Implemented |
TT0231 # 02 Y:2019 | 02 | 2019 | INSTALL COMMON HEADER ON COMPRESSORS | $13,982 | $1,050 | Implemented |
TT0231 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $4,149 | $10,500 | Implemented |
TT0231 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,033 | $25 | Implemented |
TT0231 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $886 | $40 | Implemented |
TT0231 # 06 Y:2019 | 06 | 2019 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $650 | $1,650 | Implemented |
TT0230 # 01 Y:2019 | 01 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $37,500 | $0 | Implemented |
TT0230 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,000 | $6,000 | Not Implemented |
TT0230 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,935 | $39,040 | Implemented |
TT0230 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,630 | $30,000 | Not Implemented |
TT0230 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,238 | $3,200 | Implemented |
TT0230 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $2,786 | $10,000 | Not Implemented |
TT0230 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,661 | $1,618 | Implemented |
TT0230 # 08 Y:2019 | 08 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $289 | $20 | Implemented |
TT0229 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,943 | $5,000 | Not Implemented |