Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0656 # 02 Y:2015 02 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $188,688 $247,000 Implemented
OR0656 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,591 $27,789 Implemented
OR0656 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $317,386 $0 Not Implemented
OR0656 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,282 $22,500 Implemented
OR0653 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $118,419 $40,792 Not Implemented
OR0653 # 02 Y:2015 02 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,536 $30,728 Not Implemented
OR0653 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $3,897 $4,580 Not Implemented
OR0653 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $611 $1,058 Not Implemented
OR0653 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,262 $15,398 Not Implemented
OR0653 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,625 $1,000 Not Implemented
OR0652 # 01 Y:2015 01 2015 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $7,000 $54,000 Not Implemented
OR0652 # 02 Y:2015 02 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,010 $2,900 Not Implemented
OR0652 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,990 $0 Not Implemented
OR0652 # 04 Y:2015 04 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $6,390 $51,745 Not Implemented
OR0652 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,000 $15,000 Not Implemented
OR0651 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $58,422 $9,638 Implemented
OR0651 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $270,822 $210,050 Implemented
OR0651 # 03 Y:2015 03 2015 RECOVER AND REUSE WASTE MATERIAL $93,635 $132,280 Not Implemented
OR0650 # 01 Y:2015 01 2015 ELIMINATE/REDUCE AN OPERATION $20,348 $2,295 Not Implemented
OR0650 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $23,922 $24,660 Not Implemented
OR0650 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $719 $1,200 Implemented
OR0650 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,001 $2,678 Not Implemented
OR0650 # 05 Y:2015 05 2015 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $1,291 $4,404 Implemented
OR0650 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $16,731 $135,510 Not Implemented
OR0649 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $18,604 $16,250 Not Implemented