Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0102 # 06 Y:1998 | 06 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $21,040 | $7,500 | Not Implemented |
BD0102 # 07 Y:1998 | 07 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $8,411 | $0 | Not Implemented |
BD0102 # 08 Y:1998 | 08 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $665,600 | $150,000 | Not Implemented |
WI0311 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,098 | $40,000 | Not Implemented |
WI0311 # 02 Y:1998 | 02 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,699 | $5,024 | Not Implemented |
WI0311 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,492 | $7,504 | Implemented |
WI0311 # 04 Y:1998 | 04 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $3,414 | $7,000 | Not Implemented |
WI0311 # 05 Y:1998 | 05 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,196 | $0 | Not Implemented |
WI0311 # 06 Y:1998 | 06 | 1998 | INSULATE BARE EQUIPMENT | $548 | $532 | Not Implemented |
BD0101 # 01 Y:1998 | 01 | 1998 | INSTALL TURBULATORS | $28,680 | $1,650 | Implemented |
BD0101 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $26,005 | $40,190 | Implemented |
BD0101 # 03 Y:1998 | 03 | 1998 | INSTALL AUTOMATIC STACK DAMPER | $6,809 | $2,100 | Not Implemented |
BD0101 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,851 | $3,986 | Implemented |
BD0101 # 05 Y:1998 | 05 | 1998 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $32,510 | $128,700 | Not Implemented |
BD0101 # 06 Y:1998 | 06 | 1998 | MINIMIZE WATER USAGE | $688 | $1,625 | Implemented |
BD0101 # 07 Y:1998 | 07 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $133,152 | $72,000 | Not Implemented |
BD0100 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,782 | $10,300 | Not Implemented |
BD0100 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $1,212 | $200 | Not Implemented |
BD0100 # 03 Y:1997 | 03 | 1997 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $981 | $1,500 | Not Implemented |
BD0100 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $335 | $698 | Not Implemented |
BD0100 # 05 Y:1997 | 05 | 1997 | INSULATE BARE EQUIPMENT | $200 | $369 | Not Implemented |
BD0100 # 06 Y:1997 | 06 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,880 | $30,000 | Implemented |
BD0100 # 07 Y:1997 | 07 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,996 | $750 | Not Implemented |
BD0100 # 08 Y:1997 | 08 | 1997 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $832 | $420 | Not Implemented |
BD0100 # 09 Y:1997 | 09 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $260,375 | $900,000 | Not Implemented |