IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0225 # 06 Y:1984 06 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $0 Not Implemented
TN0225 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,159 $3,500 Not Implemented
TN0226 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $24,450 $5,000 Implemented
TN0226 # 02 Y:1984 02 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,593 $2,240 Implemented
TN0226 # 03 Y:1984 03 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,315 $5,800 Not Implemented
TN0226 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,424 $45 Implemented
TN0226 # 05 Y:1984 05 1984 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,987 $0 Not Implemented
TN0226 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $1,451 $1,000 Implemented
TS0007 # 01 Y:1984 01 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,640 $34,000 Not Implemented
TS0007 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,248 $25,350 Not Implemented
TS0007 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,860 $0 Implemented
TS0007 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,243 $0 Implemented
UD0139 # 01 Y:1984 01 1984 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,912 $510 Implemented
UD0139 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $3,450 $62 Implemented
UD0139 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $530 Implemented
UD0139 # 04 Y:1984 04 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,318 $0 Implemented
UD0139 # 05 Y:1984 05 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,736 $15,100 Implemented
UD0140 # 01 Y:1984 01 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $947 $1,280 Implemented
UD0140 # 02 Y:1984 02 1984 ISOLATE HOT OR COLD EQUIPMENT $2,075 $1,240 Implemented
UD0140 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,348 $708 Implemented
UD0140 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $21,331 $10,185 Implemented
UD0140 # 05 Y:1984 05 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $3,213 $3,000 Not Implemented
UD0140 # 06 Y:1984 06 1984 REPLACE BOILER $40,533 $25,000 Not Implemented
UD0140 # 07 Y:1984 07 1984 RECOVER AND REUSE COOLING WATER $1,755 $0 Implemented
UD0140 # 08 Y:1984 08 1984 RECOVER WASTE HEAT FROM EQUIPMENT $983 $1,500 Not Implemented