IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0127 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $13,877 $9,532 Not Implemented
IP0127 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,631 $46,979 Not Implemented
IP0127 # 07 Y:2019 07 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $130,871 $597,520 Not Implemented
MZ0285 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $4,249 $7,200 Not Implemented
MZ0285 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,338 $2,880 Implemented
MZ0285 # 03 Y:2019 03 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $66,439 $129,987 Not Implemented
MZ0285 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,668 $1,820 Implemented
MZ0285 # 05 Y:2019 05 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,415 $7,000 Not Implemented
MZ0285 # 06 Y:2019 06 2019 USE COMPRESSOR AIR FILTERS $1,546 $360 Implemented
AM0788 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,300 $28,750 Not Implemented
AM0788 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,355 $1,000 Implemented
AM0788 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,200 $17,300 Implemented
AM0788 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,125 $4,520 Implemented
AM0788 # 05 Y:2019 05 2019 PAY UTILITY BILLS ON TIME $1,270 $0 Implemented
AM0788 # 06 Y:2019 06 2019 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $860 $124 Implemented
SF0547 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,284 $0 Implemented
SF0547 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,962 $360 Implemented
SF0547 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,625 $240 Implemented
SF0547 # 04 Y:2019 04 2019 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,499 $960 Not Implemented
SF0547 # 05 Y:2019 05 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $40,841 $4,800 Not Implemented
SF0547 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,127 $1,647 Implemented
SF0547 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $4,069 $7,542 Not Implemented
SF0547 # 08 Y:2019 08 2019 AIR CONDITION ONLY SPACE NECESSARY $17,743 $33,601 Implemented
SF0547 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $3,114 $6,574 Implemented
SF0547 # 10 Y:2019 10 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $120,071 $1,107,885 Not Implemented