Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0127 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $13,877 | $9,532 | Not Implemented |
IP0127 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,631 | $46,979 | Not Implemented |
IP0127 # 07 Y:2019 | 07 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $130,871 | $597,520 | Not Implemented |
MZ0285 # 01 Y:2019 | 01 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,249 | $7,200 | Not Implemented |
MZ0285 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,338 | $2,880 | Implemented |
MZ0285 # 03 Y:2019 | 03 | 2019 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $66,439 | $129,987 | Not Implemented |
MZ0285 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,668 | $1,820 | Implemented |
MZ0285 # 05 Y:2019 | 05 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,415 | $7,000 | Not Implemented |
MZ0285 # 06 Y:2019 | 06 | 2019 | USE COMPRESSOR AIR FILTERS | $1,546 | $360 | Implemented |
AM0788 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $10,300 | $28,750 | Not Implemented |
AM0788 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,355 | $1,000 | Implemented |
AM0788 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,200 | $17,300 | Implemented |
AM0788 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,125 | $4,520 | Implemented |
AM0788 # 05 Y:2019 | 05 | 2019 | PAY UTILITY BILLS ON TIME | $1,270 | $0 | Implemented |
AM0788 # 06 Y:2019 | 06 | 2019 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $860 | $124 | Implemented |
SF0547 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,284 | $0 | Implemented |
SF0547 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,962 | $360 | Implemented |
SF0547 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,625 | $240 | Implemented |
SF0547 # 04 Y:2019 | 04 | 2019 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $8,499 | $960 | Not Implemented |
SF0547 # 05 Y:2019 | 05 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $40,841 | $4,800 | Not Implemented |
SF0547 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,127 | $1,647 | Implemented |
SF0547 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,069 | $7,542 | Not Implemented |
SF0547 # 08 Y:2019 | 08 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $17,743 | $33,601 | Implemented |
SF0547 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $3,114 | $6,574 | Implemented |
SF0547 # 10 Y:2019 | 10 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $120,071 | $1,107,885 | Not Implemented |