IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0086 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,569 $1,500 Not Implemented
BD0086 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $520 Not Implemented
BD0086 # 04 Y:1997 04 1997 INSTALL OCCUPANCY SENSORS $1,024 $750 Not Implemented
BD0086 # 05 Y:1997 05 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $904 $750 Not Implemented
BD0086 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $859 $2,750 Not Implemented
BD0086 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,554 $14,000 Not Implemented
BD0086 # 08 Y:1997 08 1997 USE A RAG RECYCLE SERVICE $1,404 $0 Not Implemented
BD0086 # 09 Y:1997 09 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $18,750 $4,000 Not Implemented
WI0298 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,190 $30,000 Implemented
WI0298 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,867 $1,480 Not Implemented
WI0298 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,444 $120 Implemented
WI0298 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,193 $0 Not Implemented
WI0298 # 05 Y:1997 05 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $24,000 $20,000 Implemented
WI0298 # 06 Y:1997 06 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,119 $18,000 Not Implemented
WI0298 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $2,100 $1,000 Not Implemented
WI0298 # 08 Y:1997 08 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $686 $0 Not Implemented
WI0298 # 09 Y:1997 09 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $140 $0 Not Implemented
BD0084 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,581 $5,500 Implemented
BD0084 # 02 Y:1997 02 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $7,164 $3,500 Not Implemented
BD0084 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $4,774 $6,850 Not Implemented
BD0084 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,816 $4,933 Not Implemented
BD0084 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,205 $11,750 Not Implemented
BD0084 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,580 $675 Not Implemented
BD0084 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,425 $1,200 Not Implemented
BD0084 # 08 Y:1997 08 1997 RECOVER AND REUSE COOLING WATER $8,749 $7,500 Implemented