IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0077 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,964 $10,588 Implemented
BD0077 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $2,534 $2,745 Not Implemented
BD0077 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,692 $6,230 Implemented
BD0077 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,892 $2,500 Implemented
BD0077 # 06 Y:1997 06 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $67,324 $16,500 Not Implemented
BD0077 # 07 Y:1997 07 1997 REDUCE SCRAP PRODUCTION $46,525 $4,500 Implemented
BD0077 # 08 Y:1997 08 1997 MINIMIZE WATER USAGE $1,091 $2,250 Not Implemented
BD0077 # 09 Y:1997 09 1997 MOVE PRODUCT USING MECHANICAL MEANS $20,355 $0 Not Implemented
BD0076 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $11,003 $2,000 n/a
BD0076 # 02 Y:1997 02 1997 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,713 $2,690 n/a
BD0076 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,623 $5,410 n/a
BD0076 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,498 $500 n/a
BD0076 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $0 n/a
BD0076 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $1,007 n/a
BD0076 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $445 $450 n/a
BD0076 # 08 Y:1997 08 1997 RECOVER AND REUSE WASTE MATERIAL $63,963 $30,000 n/a
BD0076 # 09 Y:1997 09 1997 MINIMIZE WATER USAGE $304 $775 n/a
WI0287 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $71,155 $98,280 Not Implemented
WI0287 # 02 Y:1997 02 1997 RECOVER WASTE HEAT FROM EQUIPMENT $27,837 $11,500 Not Implemented
WI0287 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,030 $0 Not Implemented
WI0287 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,602 $5,000 Not Implemented
WI0287 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,279 $400 Not Implemented
WI0287 # 06 Y:1997 06 1997 TREAT AND REUSE RINSE WATERS $1,041 $1,475 Implemented
WI0287 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $985 $30 Not Implemented
WI0287 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $439 $736 Implemented