IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0606 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $20,282 $25,500 Not Implemented
OR0605 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,401 $11,850 Not Implemented
OR0605 # 02 Y:2013 02 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $29,593 $32,655 Implemented
OR0605 # 03 Y:2013 03 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $23,767 $234,289 Not Implemented
BS0017 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $268 $182 Implemented
BS0017 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $977 Implemented
BS0017 # 03 Y:2013 03 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,029 $4,500 Implemented
BS0017 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $207 $48 Implemented
BS0017 # 05 Y:2013 05 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $998 $1,134 Not Implemented
BS0017 # 06 Y:2013 06 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,115 $2,167 Implemented
OR0603 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $11,386 $5,275 Not Implemented
OR0603 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,204 $0 Implemented
OR0603 # 03 Y:2013 03 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,936 $0 Implemented
OR0603 # 04 Y:2013 04 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $8,411 $293,900 Not Implemented
OR0603 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $73,635 $1,475,828 Not Implemented
OR0601 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,114 $0 Implemented
OR0601 # 02 Y:2013 02 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,408 $3,874 Not Implemented
OR0601 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,167 $2,000 Not Implemented
OR0601 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,338 $1,616 Not Implemented
OR0601 # 05 Y:2013 05 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $51,858 $112,345 Not Implemented
OR0601 # 06 Y:2013 06 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,546 $5,306 Implemented
OR0601 # 07 Y:2013 07 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,479 $35,500 Not Implemented
OR0601 # 08 Y:2013 08 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,164 $8,104 Implemented
BS0013 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,038 $5,639 Implemented
BS0013 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,210 $20 Implemented