Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0055 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,969 | $715 | Not Implemented |
WM0055 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $610 | $630 | Not Implemented |
WM0055 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,131 | $7,030 | Not Implemented |
WM0055 # 07 Y:2014 | 07 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,975 | $0 | Not Implemented |
WM0055 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $955 | $3,000 | Not Implemented |
WM0055 # 09 Y:2014 | 09 | 2014 | MINIMIZE WATER USAGE | $24,836 | $160 | Not Implemented |
UK1408 # 01 Y:2014 | 01 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $15,613 | $3,894 | Not Implemented |
UK1408 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,448 | $2,000 | Implemented |
UK1408 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $7,600 | $17,000 | Not Implemented |
UK1408 # 04 Y:2014 | 04 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $40,960 | $204,000 | Not Implemented |
UK1408 # 05 Y:2014 | 05 | 2014 | OPTIMIZE PLANT POWER FACTOR | $36,000 | $32,528 | Implemented |
UK1408 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $217,346 | $140,476 | Not Implemented |
UK1408 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580,500 | $386,500 | Not Implemented |
OR0638 # 01 Y:2014 | 01 | 2014 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $237,276 | $62,840 | Not Implemented |
OR0638 # 02 Y:2014 | 02 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $28,255 | $27,375 | Not Implemented |
OR0638 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,466 | $8,550 | Not Implemented |
OR0638 # 04 Y:2014 | 04 | 2014 | MINIMIZE WATER USAGE | $1,003 | $0 | Implemented |
OR0638 # 05 Y:2014 | 05 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,008 | $9,020 | Not Implemented |
OR0638 # 06 Y:2014 | 06 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,207 | $13,800 | Not Implemented |
OR0638 # 07 Y:2014 | 07 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,180 | $10,000 | Implemented |
OK0898 # 01 Y:2014 | 01 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $12,191 | $15,000 | Not Implemented |
OK0898 # 02 Y:2014 | 02 | 2014 | INSTALL SET-BACK TIMERS | $3,689 | $1,965 | Not Implemented |
OK0898 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,132 | $1,689 | Implemented |
OK0898 # 04 Y:2014 | 04 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $303 | $270 | Implemented |
OK0898 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,300 | $11,014 | Not Implemented |