IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,704

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0070 # 07 Y:1996 07 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $166,575 $30,700 Not Implemented
BD0070 # 08 Y:1996 08 1996 RECOVER AND REUSE COOLING WATER $26,766 $19,320 Not Implemented
WI0281 # 01 Y:1996 01 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $33,184 $80,000 Not Implemented
WI0281 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,144 $12,950 Not Implemented
WI0281 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,250 $0 Not Implemented
WI0281 # 04 Y:1996 04 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $19,457 $15,000 Not Implemented
WI0281 # 05 Y:1996 05 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,051 $26,220 Not Implemented
WI0281 # 06 Y:1996 06 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,879 $0 Implemented
WI0281 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,899 $210 Implemented
WI0281 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $870 $740 Not Implemented
WI0281 # 09 Y:1996 09 1996 INSTALL AUTOMATIC STACK DAMPER $931 $1,100 Not Implemented
WI0281 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,554 $701 Implemented
BD0069 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $5,002 $3,225 Not Implemented
BD0069 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,228 $4,228 Not Implemented
BD0069 # 03 Y:1996 03 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,652 $2,000 Implemented
BD0069 # 04 Y:1996 04 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,520 $1,950 Not Implemented
BD0069 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $3,591 Implemented
BD0069 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $400 Not Implemented
BD0069 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $2,159 $3,500 Not Implemented
BD0056 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,744 $7,010 Implemented
BD0056 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,746 $3,208 Implemented
BD0056 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $1,033 $825 Not Implemented
BD0056 # 04 Y:1996 04 1996 USE SYNTHETIC LUBRICANT $546 $175 Not Implemented
BD0056 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,490 $900 Implemented
BD0056 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $400 Implemented