Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,704
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0272 # 01 Y:1996 | 01 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,159 | $13,000 | Not Implemented |
WI0272 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,696 | $5,280 | Not Implemented |
WI0272 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $414 | $683 | Implemented |
WI0272 # 04 Y:1996 | 04 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,511 | $960 | Not Implemented |
WI0272 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $251 | $0 | Implemented |
WI0272 # 06 Y:1996 | 06 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,500 | $0 | Not Implemented |
WI0272 # 07 Y:1996 | 07 | 1996 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $815 | $0 | Implemented |
WI0272 # 08 Y:1996 | 08 | 1996 | REPAIR FAULTY LOUVERS AND DAMPERS | $628 | $1,100 | Not Implemented |
WI0272 # 09 Y:1996 | 09 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $211 | $200 | Not Implemented |
WI0271 # 01 Y:1996 | 01 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,700 | $0 | Implemented |
WI0271 # 02 Y:1996 | 02 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,497 | $700 | Not Implemented |
WI0271 # 03 Y:1996 | 03 | 1996 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,508 | $500 | Not Implemented |
WI0271 # 04 Y:1996 | 04 | 1996 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,202 | $3,900 | Not Implemented |
WI0271 # 05 Y:1996 | 05 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,130 | $1,900 | Not Implemented |
WI0271 # 06 Y:1996 | 06 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $125 | $250 | Not Implemented |
WI0271 # 07 Y:1996 | 07 | 1996 | INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION | $873 | $0 | Implemented |
WI0271 # 08 Y:1996 | 08 | 1996 | INSTALL OCCUPANCY SENSORS | $280 | $600 | Implemented |
WI0271 # 09 Y:1996 | 09 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $172 | $85 | Implemented |
WI0271 # 10 Y:1996 | 10 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $124 | $60 | Implemented |
WI0271 # 11 Y:1996 | 11 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $293 | $640 | Implemented |
WI0268 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,745 | $1,950 | Not Implemented |
WI0268 # 02 Y:1996 | 02 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,104 | $0 | Not Implemented |
WI0268 # 03 Y:1996 | 03 | 1996 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,583 | $0 | Not Implemented |
WI0268 # 04 Y:1996 | 04 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $267 | $400 | Not Implemented |
WI0268 # 05 Y:1996 | 05 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,400 | $0 | Not Implemented |