IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0013 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $250 Not Implemented
BS0013 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,825 $22,200 Not Implemented
BS0013 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $312 $77 Implemented
BS0013 # 06 Y:2013 06 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,270 $360 Not Implemented
BS0011 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,102 $973 Implemented
BS0011 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $4,008 $6,725 Implemented
BS0011 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,728 $29,500 Not Implemented
BS0011 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,878 $6,670 Not Implemented
BS0011 # 05 Y:2012 05 2012 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $8,243 $900 Not Implemented
BS0011 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $250 $600 Implemented
OR0598 # 01 Y:2012 01 2012 RECYCLE CASTING SAND $437,377 $71,170 Not Implemented
OR0598 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $2,289 $1,015 Not Implemented
OR0598 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,034 $1,534 Not Implemented
OR0597 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,480 $9,480 Implemented
OR0597 # 02 Y:2012 02 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,834 $41,834 Not Implemented
OR0597 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,892 $11,892 Not Implemented
OR0597 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $3,853 $3,853 Implemented
OR0596 # 01 Y:2012 01 2012 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,782 $7,200 Not Implemented
OR0596 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $7,460 Not Implemented
OR0596 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,779 $2,217 Implemented
OR0596 # 04 Y:2012 04 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,274 $46,450 Not Implemented
OR0596 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,326 $6,711 Not Implemented
OR0596 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $80,359 $51,328 Not Implemented
OR0596 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $48,291 $10,000 Implemented
OR0595 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,800 $8,370 Implemented