Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0341 # 10 Y:2018 | 10 | 2018 | OPTIMIZE PLANT POWER FACTOR | $17,936 | $25,045 | Not Implemented |
MI0341 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $3,246 | $2,109 | Not Implemented |
MI0341 # 12 Y:2018 | 12 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $803 | $1,560 | Not Implemented |
SU0466 # 01 Y:2018 | 01 | 2018 | ELIMINATE/REDUCE AN OPERATION | $9,225 | $1,173 | Not Implemented |
SU0466 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,326 | $2,058 | Implemented |
SU0466 # 03 Y:2018 | 03 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $166,039 | $203,490 | Not Implemented |
SU0466 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $586 | $876 | Implemented |
SU0466 # 05 Y:2018 | 05 | 2018 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $111 | $217 | Not Implemented |
SU0466 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,439 | $44,602 | Implemented |
OK0994 # 01 Y:2018 | 01 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,051 | $590 | Implemented |
OK0994 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,833 | $8,422 | Implemented |
OK0994 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,575 | $29,950 | Implemented |
WM0126 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $95,648 | $66,000 | Not Implemented |
WM0126 # 02 Y:2018 | 02 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $26,985 | $20,000 | Not Implemented |
WM0126 # 03 Y:2018 | 03 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,198 | $48,500 | Not Implemented |
WM0126 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,475 | $8,650 | Not Implemented |
WM0126 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $15,236 | Implemented |
WM0126 # 06 Y:2018 | 06 | 2018 | REPAIR OR REPLACE STEAM TRAPS | $7,154 | $6,480 | Implemented |
WM0126 # 07 Y:2018 | 07 | 2018 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,029 | $1,710 | Not Implemented |
WM0126 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,101 | $2,850 | Not Implemented |
WM0126 # 09 Y:2018 | 09 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,864 | $0 | Not Implemented |
WV0566 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,590 | $114,000 | Not Implemented |
WV0566 # 02 Y:2018 | 02 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $4,621 | $945 | Implemented |
WV0566 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,255 | $600 | Implemented |
WV0566 # 04 Y:2018 | 04 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,029 | $500 | Implemented |