Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0589 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,192 | $640 | Implemented |
UD0589 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,943 | $6,246 | Not Implemented |
UD0589 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,077 | $4,500 | Not Implemented |
UD0588 # 01 Y:2000 | 01 | 2000 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $52,000 | $172,190 | Not Implemented |
UD0588 # 02 Y:2000 | 02 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,705 | $0 | Implemented |
UD0588 # 03 Y:2000 | 03 | 2000 | ADJUST PH FOR NEUTRALIZATION | $7,560 | $30,000 | Not Implemented |
UD0588 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,045 | $3,000 | Not Implemented |
UD0588 # 05 Y:2000 | 05 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,950 | $0 | Not Implemented |
UD0587 # 01 Y:2000 | 01 | 2000 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $374,400 | $0 | Implemented |
UD0587 # 02 Y:2000 | 02 | 2000 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $365,350 | $1,000,000 | Not Implemented |
UD0587 # 03 Y:2000 | 03 | 2000 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $195,104 | $6,720 | Not Implemented |
UD0587 # 04 Y:2000 | 04 | 2000 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $32,550 | $0 | Implemented |
UD0587 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,175 | $39,298 | Not Implemented |
UD0587 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $748 | $360 | Implemented |
UD0586 # 01 Y:2000 | 01 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $454,896 | $340,000 | Not Implemented |
UD0586 # 02 Y:2000 | 02 | 2000 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $99,635 | $350,000 | Not Implemented |
UD0586 # 03 Y:2000 | 03 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $96,665 | $5,000 | Not Implemented |
UD0586 # 04 Y:2000 | 04 | 2000 | MINIMIZE WATER USAGE | $18,654 | $298 | Implemented |
UD0586 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,183 | $0 | Implemented |
UD0586 # 06 Y:2000 | 06 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,583 | $0 | Not Implemented |
UD0585 # 01 Y:2000 | 01 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $40,793 | $76,500 | Not Implemented |
UD0585 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,367 | $32,550 | Implemented |
UD0585 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,347 | $100 | Implemented |
UD0585 # 04 Y:2000 | 04 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,563 | $0 | Not Implemented |
UD0585 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,729 | $16,995 | Implemented |