IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0635 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,475 $7,174 Not Implemented
OR0635 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,287 $1,628 Not Implemented
OR0635 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $56,191 $56,191 Not Implemented
OR0635 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,844 $15,843 Not Implemented
OR0635 # 05 Y:2014 05 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,961 $9,068 Not Implemented
OR0635 # 06 Y:2014 06 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $181,002 $170,561 Not Implemented
OR0635 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $40,819 $43,800 Not Implemented
OR0634 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $102,712 $87,114 Not Implemented
OR0634 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,951 $0 Not Implemented
OR0634 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101,299 $258,445 Not Implemented
OR0634 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,747 $1,502 Not Implemented
OR0634 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,923 $1,344 Not Implemented
OR0634 # 06 Y:2014 06 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $22,225 $0 Not Implemented
OR0633 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $107,219 $4,630 Not Implemented
OR0633 # 02 Y:2014 02 2014 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $392,710 $105,114 Not Implemented
OR0633 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $2,456 $1,771 Not Implemented
OR0633 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,929 $4,920 Not Implemented
OR0632 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $3,802 $0 Not Implemented
OR0632 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,497 $2,837 Implemented
OR0632 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,285 $0 Not Implemented
OR0632 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $870 $500 Implemented
OR0632 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $2,833 $0 Not Implemented
OR0628 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $44,216 $17,353 Not Implemented
OR0628 # 02 Y:2014 02 2014 USE OPTIMUM THICKNESS INSULATION $3,869 $828 Not Implemented
OR0628 # 03 Y:2014 03 2014 PAY BILLS ON TIME TO AVOID LATE FEES $3,198 $0 Not Implemented