IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0571 # 09 Y:1999 09 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,489 $0 Not Implemented
UD0570 # 01 Y:1999 01 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $27,963 $0 Implemented
UD0570 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,639 $8,900 Not Implemented
UD0570 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,148 $200 Implemented
UD0569 # 01 Y:1999 01 1999 RECYCLE WHITE WATER $90,440 $0 Not Implemented
UD0569 # 02 Y:1999 02 1999 INCREASE USE OF AUTOMATION $65,250 $0 Implemented
UD0569 # 03 Y:1999 03 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $8,400 $2,500 Not Implemented
UD0569 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,058 $12,380 Not Implemented
UD0569 # 05 Y:1999 05 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,848 $632 Implemented
UD0568 # 01 Y:1999 01 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $8,393 $3,600 Not Implemented
UD0568 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,475 $7,000 Not Implemented
UD0568 # 03 Y:1999 03 1999 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $5,171 $4,000 Implemented
UD0568 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,154 $2,000 Not Implemented
UD0567 # 01 Y:1999 01 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $1,501,920 $1,075,000 Implemented
UD0567 # 02 Y:1999 02 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,154,672 $1,100,000 Not Implemented
UD0567 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $32,400 $90,000 Implemented
UD0567 # 04 Y:1999 04 1999 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $18,000 $30,000 Not Implemented
UD0567 # 05 Y:1999 05 1999 UPGRADE CONTROLS ON COMPRESSORS $7,855 $2,508 Implemented
UD0567 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,178 $9,800 Implemented
UD0566 # 01 Y:1999 01 1999 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $110,878 $86,000 Not Implemented
UD0566 # 02 Y:1999 02 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $59,980 $6,380 Implemented
UD0566 # 03 Y:1999 03 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $53,332 $0 Not Implemented
UD0566 # 04 Y:1999 04 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $19,000 $0 Not Implemented
UD0566 # 05 Y:1999 05 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,598 $15,000 Implemented
UD0566 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,800 $0 Not Implemented