IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,350

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0235 # 13 Y:2002 13 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $7,395 $0 Not Implemented
SF0235 # 14 Y:2002 14 2002 OPTIMIZE PLANT POWER FACTOR $4,195 $7,970 Implemented
LM0033 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $6,143 $10,400 Not Implemented
LM0033 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,578 $0 Not Implemented
LM0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,854 $370 Not Implemented
LM0033 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $23,073 $31,000 Not Implemented
LM0033 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $64,833 $96,800 Not Implemented
LM0033 # 06 Y:2002 06 2002 UTILIZE OUTSIDE CONTRACTING $22,623 $12,000 Not Implemented
LM0033 # 07 Y:2002 07 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $243,003 $208,000 Not Implemented
LM0033 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $237,812 $70,000 Not Implemented
LM0033 # 09 Y:2002 09 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $90,240 $34,800 Not Implemented
LM0033 # 10 Y:2002 10 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $231,120 $395,000 Not Implemented
LM0032 # 05 Y:2002 05 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,275 $2,572 Implemented
LM0032 # 06 Y:2002 06 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $78,909 $130,043 Implemented
LM0032 # 07 Y:2002 07 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $22,049 $60,000 Implemented
LM0032 # 01 Y:2002 01 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,509 $0 Implemented
LM0032 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $5,597 $10,400 Not Implemented
LM0032 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,278 $576 Not Implemented
LM0032 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $306 $160 Implemented
LM0031 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $15,266 $678 Not Implemented
LM0031 # 02 Y:2002 02 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $1,411 $3,420 Not Implemented
LM0031 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $0 Not Implemented
LM0031 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,486 $44,650 Not Implemented
LM0031 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,152 $100 Implemented
LM0031 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $614 $20 Implemented