IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0559 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,288 $0 Implemented
UD0558 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,790 $8,000 Implemented
UD0558 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,343 $45,360 Implemented
UD0558 # 03 Y:1998 03 1998 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,068 $7,600 Not Implemented
UD0558 # 04 Y:1998 04 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,453 $8,000 Implemented
UD0558 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,200 $0 Implemented
UD0557 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,942 $12,000 Implemented
UD0557 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,203 $0 Implemented
UD0557 # 03 Y:1998 03 1998 RECYCLE CLEANING SOLVENT AND REUSE $9,078 $0 Not Implemented
UD0557 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,643 $1,440 Not Implemented
UD0557 # 05 Y:1998 05 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,636 $6,680 Not Implemented
UD0557 # 06 Y:1998 06 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,778 $0 Not Implemented
UD0556 # 01 Y:1998 01 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $189,046 $0 Implemented
UD0556 # 02 Y:1998 02 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $19,800 $0 Implemented
UD0556 # 03 Y:1998 03 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $8,037 $200 Implemented
UD0556 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,225 $11,147 Implemented
UD0556 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,784 $0 Implemented
UD0556 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,459 $0 Implemented
UD0556 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $1,680 $2,250 Implemented
UD0556 # 08 Y:1998 08 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $532 $200 Implemented
UD0555 # 01 Y:1998 01 1998 EXPAND OPERATIONS INTO UNUSED SPACE $237,283 $1,313,000 Implemented
UD0555 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $123,160 $115,000 Not Implemented
UD0555 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $22,667 $20,000 Not Implemented
UD0555 # 04 Y:1998 04 1998 ELIMINATE/REDUCE AN OPERATION $17,490 $0 Implemented
UD0555 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,454 $0 Implemented