IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0717 # 07 Y:2001 07 2001 FILTER AND REUSE HYDRAULIC OIL $1,030 $1,000 Implemented
GT0717 # 08 Y:2001 08 2001 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $6,000 $25,180 Implemented
GT0717 # 09 Y:2001 09 2001 INSTALL BACK-UP EQUIPMENT $7,200 $29,314 Implemented
GT0708 # 01 Y:2001 01 2001 MOVE BOILER TO MORE EFFICIENT LOCATION $7,140 $0 Implemented
GT0708 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,765 $0 Implemented
GT0708 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $11,677 $1,000 Not Implemented
GT0708 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $38,843 $13,500 Implemented
GT0708 # 05 Y:2001 05 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $132,090 $60,000 Not Implemented
GT0708 # 06 Y:2001 06 2001 REPAIR OR REPLACE STEAM TRAPS $9,164 $10,500 Implemented
GT0708 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $21,400 Implemented
TN0676 # 01 Y:2000 01 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $105,000 $94,080 Not Implemented
TN0676 # 02 Y:2000 02 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $37,314 $28,050 Not Implemented
TN0676 # 03 Y:2000 03 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $6,275 $18,200 Implemented
TN0676 # 04 Y:2000 04 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,144 $1,200 Not Implemented
TN0676 # 05 Y:2000 05 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,496 $12,200 Implemented
TN0676 # 06 Y:2000 06 2000 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON $3,095 $6,250 Implemented
TN0676 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $1,025 $175 Implemented
TN0676 # 08 Y:2000 08 2000 METER WASTE WATER $928 $2,300 Not Implemented
NC0179 # 01 Y:1999 01 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $453 $340 Implemented
NC0179 # 02 Y:1999 02 1999 USE PHOTOCELL CONTROLS $128 $120 Not Implemented
NC0179 # 03 Y:1999 03 1999 ADD AREA LIGHTING SWITCHES $121 $640 Not Implemented
NC0179 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $164 $800 Not Implemented
NC0179 # 05 Y:1999 05 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $4,315 $1,425 Implemented
NC0179 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,000 $2,500 Not Implemented
NC0179 # 07 Y:1999 07 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $500 $0 Implemented