Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0249 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,546 | $1,660 | Implemented |
MI0249 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,904 | $80 | Implemented |
MI0249 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $329 | $1,104 | Not Implemented |
IA0512 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,448 | $356 | Implemented |
IA0512 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,848 | $100 | Implemented |
IA0512 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,424 | $70 | Implemented |
IA0512 # 04 Y:2013 | 04 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $629 | $890 | Not Implemented |
OR0621 # 01 Y:2013 | 01 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,962 | $2,256 | Not Implemented |
OR0621 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,765 | $65,592 | Implemented |
OR0621 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $423 | $13,505 | Not Implemented |
IA0512 # 05 Y:2013 | 05 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $504 | $530 | Not Implemented |
IA0512 # 06 Y:2013 | 06 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $277 | $200 | Implemented |
IA0512 # 07 Y:2013 | 07 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,286 | $135,000 | Not Implemented |
OR0620 # 01 Y:2013 | 01 | 2013 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $50,574 | $68,750 | Not Implemented |
OR0620 # 02 Y:2013 | 02 | 2013 | REDUCE VENTILATION AIR | $28,525 | $3,200 | Not Implemented |
OR0620 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $456 | $163 | Not Implemented |
OR0620 # 04 Y:2013 | 04 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $442 | $481 | Not Implemented |
OR0620 # 05 Y:2013 | 05 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $584 | $2,554 | Not Implemented |
OR0619 # 01 Y:2013 | 01 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,073 | $2,342 | Not Implemented |
OR0619 # 02 Y:2013 | 02 | 2013 | REDUCE FLUID FLOW RATES | $2,879 | $6,200 | Not Implemented |
OR0619 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,300 | $50,000 | Not Implemented |
OR0619 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $679 | $1,677 | Not Implemented |
OR0619 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,667 | $2,342 | Not Implemented |
OR0619 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,550 | $13,225 | Not Implemented |
SD0477 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,922 | $17,910 | Not Implemented |