Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,980
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0546 # 05 Y:1998 | 05 | 1998 | REDUCE SCRAP PRODUCTION | $1,933 | $0 | Not Implemented |
UD0546 # 06 Y:1998 | 06 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $622 | $600 | Not Implemented |
UD0545 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,114 | $15,000 | Not Implemented |
UD0545 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,984 | $10,116 | Implemented |
UD0545 # 03 Y:1998 | 03 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,753 | $500 | Not Implemented |
UD0545 # 04 Y:1998 | 04 | 1998 | COMBINE UTILITY METERS | $308 | $0 | Not Implemented |
UD0544 # 01 Y:1998 | 01 | 1998 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $15,189 | $500 | Implemented |
UD0544 # 02 Y:1998 | 02 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $13,720 | $800 | Not Implemented |
UD0544 # 03 Y:1998 | 03 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,392 | $0 | Implemented |
UD0544 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,427 | $1,000 | Implemented |
UD0544 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,145 | $1,000 | Implemented |
UD0544 # 06 Y:1998 | 06 | 1998 | REPAIR FAULTY LOUVERS AND DAMPERS | $2,092 | $400 | Implemented |
UD0544 # 07 Y:1998 | 07 | 1998 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $2,054 | $0 | Implemented |
UD0544 # 08 Y:1998 | 08 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,695 | $3,472 | Not Implemented |
UD0544 # 09 Y:1998 | 09 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $922 | $700 | Implemented |
UD0544 # 10 Y:1998 | 10 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $769 | $0 | Implemented |
UD0543 # 01 Y:1998 | 01 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $256,936 | $100,000 | Not Implemented |
UD0543 # 02 Y:1998 | 02 | 1998 | EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING | $45,731 | $4,000 | Implemented |
UD0543 # 03 Y:1998 | 03 | 1998 | EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING | $21,625 | $4,000 | Implemented |
UD0543 # 04 Y:1998 | 04 | 1998 | EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING | $6,584 | $10,000 | Implemented |
UD0543 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,018 | $16,558 | Not Implemented |
UD0543 # 06 Y:1998 | 06 | 1998 | USE POWER DURING OFF-PEAK PERIODS | $1,660 | $0 | Implemented |
UD0542 # 01 Y:1998 | 01 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $183,600 | $0 | Implemented |
UD0542 # 02 Y:1998 | 02 | 1998 | RECOVER METALS FROM CASTING SAND | $21,000 | $4,800 | Not Implemented |
UD0542 # 03 Y:1998 | 03 | 1998 | USE POWER DURING OFF-PEAK PERIODS | $11,143 | $0 | Implemented |