IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,920

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0114 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,627 $3,217 Implemented
UM0114 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,918 $17,712 Implemented
UM0114 # 03 Y:1998 03 1998 USE RADIANT HEATER FOR SPOT HEATING $1,806 $192 Not Implemented
UM0114 # 04 Y:1998 04 1998 $22,312 $2,560 Not Implemented
UM0114 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,600 $2,400 Implemented
UM0114 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,900 $33,000 Not Implemented
UD0538 # 01 Y:1998 01 1998 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION $211,528 $50,000 Implemented
UD0538 # 02 Y:1998 02 1998 MOVE PRODUCT USING MECHANICAL MEANS $44,426 $3,000 Not Implemented
UD0538 # 03 Y:1998 03 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,377 $-10,000 Not Implemented
UD0538 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,771 $5,737 Implemented
UM0113 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,418 $2,142 Implemented
UM0113 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,663 $25,773 Implemented
UM0113 # 03 Y:1998 03 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $436 $650 Not Implemented
UM0113 # 04 Y:1998 04 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,162 $960 Implemented
UM0113 # 05 Y:1998 05 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $7,020 $16,000 Not Implemented
UM0113 # 06 Y:1998 06 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,814 $11,000 Not Implemented
UM0113 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,000 $1,554 Implemented
UM0113 # 08 Y:1998 08 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $3,480 $3,342 Implemented
UD0537 # 01 Y:1998 01 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $5,890 $0 Implemented
UD0537 # 02 Y:1998 02 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,148 $500 Not Implemented
UD0537 # 03 Y:1998 03 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,651 $0 Not Implemented
UD0537 # 04 Y:1998 04 1998 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $693 $600 Not Implemented
UD0537 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $0 Implemented
UD0537 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $2,820 Implemented
UD0536 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,739 $17,011 Implemented