Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0114 # 04 Y:1998 | 04 | 1998 | $22,312 | $2,560 | Not Implemented | |
UM0114 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $22,600 | $2,400 | Implemented |
UM0114 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $16,900 | $33,000 | Not Implemented |
UD0538 # 01 Y:1998 | 01 | 1998 | IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION | $211,528 | $50,000 | Implemented |
UD0538 # 02 Y:1998 | 02 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $44,426 | $3,000 | Not Implemented |
UD0538 # 03 Y:1998 | 03 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,377 | $-10,000 | Not Implemented |
UD0538 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,771 | $5,737 | Implemented |
UM0113 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,418 | $2,142 | Implemented |
UM0113 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,663 | $25,773 | Implemented |
UM0113 # 03 Y:1998 | 03 | 1998 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $436 | $650 | Not Implemented |
UM0113 # 04 Y:1998 | 04 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,162 | $960 | Implemented |
UM0113 # 05 Y:1998 | 05 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $7,020 | $16,000 | Not Implemented |
UM0113 # 06 Y:1998 | 06 | 1998 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $3,814 | $11,000 | Not Implemented |
UM0113 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,000 | $1,554 | Implemented |
UM0113 # 08 Y:1998 | 08 | 1998 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $3,480 | $3,342 | Implemented |
UD0537 # 01 Y:1998 | 01 | 1998 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $5,890 | $0 | Implemented |
UD0537 # 02 Y:1998 | 02 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,148 | $500 | Not Implemented |
UD0537 # 03 Y:1998 | 03 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,651 | $0 | Not Implemented |
UD0537 # 04 Y:1998 | 04 | 1998 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $693 | $600 | Not Implemented |
UD0537 # 05 Y:1998 | 05 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $201 | $0 | Implemented |
UD0537 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $586 | $2,820 | Implemented |
UD0536 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,739 | $17,011 | Implemented |
UD0536 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,150 | $12,500 | Not Implemented |
UD0536 # 03 Y:1998 | 03 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,884 | $-6,000 | Not Implemented |
UD0536 # 04 Y:1998 | 04 | 1998 | USE OTHER WASTE CONCENTRATION METHODS | $3,341 | $15,000 | Not Implemented |