Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0296 # 01 Y:2004 | 01 | 2004 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $39,660 | $7,500 | Implemented |
NC0291 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $433 | $214 | Implemented |
NC0291 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $208 | $100 | Implemented |
NC0291 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $412 | $250 | Implemented |
NC0291 # 03 Y:2004 | 03 | 2004 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $29,780 | $8,900 | Not Implemented |
NC0291 # 02 Y:2004 | 02 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,122 | $9,500 | Implemented |
NC0291 # 01 Y:2004 | 01 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $68,169 | $77,000 | Not Implemented |
NC0294 # 03 Y:2004 | 03 | 2004 | REDESIGN PROCESS | $9,178 | $2,200 | Not Implemented |
NC0294 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,102 | $9,225 | Implemented |
NC0294 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $600 | $100 | Implemented |
NC0294 # 02 Y:2004 | 02 | 2004 | $17,395 | $5,000 | Not Implemented | |
NC0294 # 01 Y:2004 | 01 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $19,084 | $2,780 | Implemented |
NC0287 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $803 | $1,570 | Not Implemented |
NC0287 # 01 Y:2004 | 01 | 2004 | $10,282 | $9,879 | Not Implemented | |
NC0287 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,536 | $1,096 | Not Implemented |
NC0287 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $615 | $100 | Implemented |
NC0287 # 05 Y:2004 | 05 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,915 | $750 | Implemented |
NC0287 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,732 | $700 | Implemented |
NC0290 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,085 | $5,500 | Not Implemented |
NC0290 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,346 | $2,533 | Implemented |
NC0290 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $612 | $100 | Implemented |
NC0290 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $2,865 | $9,174 | Not Implemented |
NC0290 # 01 Y:2004 | 01 | 2004 | $145,703 | $276,000 | Implemented | |
NC0290 # 02 Y:2004 | 02 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $9,371 | $4,079 | Not Implemented |
NC0290 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,206 | $2,269 | Not Implemented |