IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0631 # 02 Y:1997 02 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,202 $0 Not Implemented
GT0631 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $57,241 $66,640 Not Implemented
CO0404 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200 $0 Implemented
CO0404 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $440 Implemented
CO0404 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $365 $498 Implemented
CO0404 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $280 Implemented
CO0404 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,800 $5,000 Implemented
KU0486 # 09 Y:1997 09 1997 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $590 $170 Not Implemented
KU0486 # 08 Y:1997 08 1997 RECYCLE WASTE INK AND CLEANUP SOLVENT $3,180 $0 Not Implemented
KU0486 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $1,560 $1,150 Implemented
KU0486 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,020 $2,980 Implemented
KU0486 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,990 $10,200 Implemented
KU0486 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,080 $9,220 Not Implemented
KU0486 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,010 $790 Implemented
KU0486 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,710 $13,580 Implemented
KU0486 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $12,940 $11,560 Implemented
CO0403 # 06 Y:1997 06 1997 ELIMINATE SHIFT $3,120 $0 Not Implemented
CO0403 # 05 Y:1997 05 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $280 $810 Not Implemented
CO0403 # 04 Y:1997 04 1997 REPAIR AND ELIMINATE STEAM LEAKS $380 $300 Not Implemented
CO0403 # 03 Y:1997 03 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,180 $0 Not Implemented
CO0403 # 02 Y:1997 02 1997 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,790 $2,000 Not Implemented
CO0403 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,072 $6,685 Not Implemented
OK0536 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $3,824 $1,549 Not Implemented
OK0536 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,758 $224 Not Implemented
OK0536 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $689 Not Implemented