Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0631 # 02 Y:1997 | 02 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,202 | $0 | Not Implemented |
GT0631 # 01 Y:1997 | 01 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $57,241 | $66,640 | Not Implemented |
CO0404 # 05 Y:1997 | 05 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $200 | $0 | Implemented |
CO0404 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $210 | $440 | Implemented |
CO0404 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $365 | $498 | Implemented |
CO0404 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $280 | Implemented |
CO0404 # 01 Y:1997 | 01 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,800 | $5,000 | Implemented |
KU0486 # 09 Y:1997 | 09 | 1997 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $590 | $170 | Not Implemented |
KU0486 # 08 Y:1997 | 08 | 1997 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $3,180 | $0 | Not Implemented |
KU0486 # 07 Y:1997 | 07 | 1997 | INSTALL OCCUPANCY SENSORS | $1,560 | $1,150 | Implemented |
KU0486 # 06 Y:1997 | 06 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,020 | $2,980 | Implemented |
KU0486 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,990 | $10,200 | Implemented |
KU0486 # 04 Y:1997 | 04 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,080 | $9,220 | Not Implemented |
KU0486 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,010 | $790 | Implemented |
KU0486 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,710 | $13,580 | Implemented |
KU0486 # 01 Y:1997 | 01 | 1997 | INSULATE BARE EQUIPMENT | $12,940 | $11,560 | Implemented |
CO0403 # 06 Y:1997 | 06 | 1997 | ELIMINATE SHIFT | $3,120 | $0 | Not Implemented |
CO0403 # 05 Y:1997 | 05 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $280 | $810 | Not Implemented |
CO0403 # 04 Y:1997 | 04 | 1997 | REPAIR AND ELIMINATE STEAM LEAKS | $380 | $300 | Not Implemented |
CO0403 # 03 Y:1997 | 03 | 1997 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,180 | $0 | Not Implemented |
CO0403 # 02 Y:1997 | 02 | 1997 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,790 | $2,000 | Not Implemented |
CO0403 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,072 | $6,685 | Not Implemented |
OK0536 # 01 Y:1997 | 01 | 1997 | INSTALL OCCUPANCY SENSORS | $3,824 | $1,549 | Not Implemented |
OK0536 # 02 Y:1997 | 02 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,758 | $224 | Not Implemented |
OK0536 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $332 | $689 | Not Implemented |