Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0625 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $376 | $476 | Implemented |
OK0625 # 04 Y:2001 | 04 | 2001 | INSTALL SET-BACK TIMERS | $2,642 | $1,408 | Not Implemented |
OK0625 # 05 Y:2001 | 05 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $868 | $230 | Implemented |
OK0625 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $39,782 | $95,000 | Implemented |
OK0625 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,200 | $30,400 | Implemented |
OK0628 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $8,150 | $310 | Implemented |
OK0628 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $357 | $613 | Implemented |
OK0628 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,940 | $3,013 | Implemented |
OK0628 # 04 Y:2001 | 04 | 2001 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,448 | $1,500 | Implemented |
OK0628 # 05 Y:2001 | 05 | 2001 | INCREASE AMOUNT OF CONDENSATE RETURNED | $39,477 | $20,922 | Implemented |
OK0628 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $75,988 | $752 | Implemented |
OK0628 # 07 Y:2001 | 07 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $20,767 | $5,653 | Not Implemented |
OK0628 # 08 Y:2001 | 08 | 2001 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $456,570 | $93,000 | Not Implemented |
OK0628 # 09 Y:2001 | 09 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $5,452 | $500 | Not Implemented |
OK0628 # 10 Y:2001 | 10 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,112 | $100,000 | Not Implemented |
SU0123 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $347 | $117 | Implemented |
SU0123 # 08 Y:2001 | 08 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $42 | $3 | Implemented |
SU0123 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $378 | $196 | Implemented |
SU0123 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $739 | $0 | Implemented |
SU0123 # 04 Y:2001 | 04 | 2001 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,800 | $0 | Implemented |
SU0123 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,325 | $7,060 | Implemented |
SU0123 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,968 | $694 | Implemented |
SU0123 # 01 Y:2001 | 01 | 2001 | ELIMINATE SHIFT | $13,517 | $0 | Not Implemented |
AS0315 # 01 Y:2001 | 01 | 2001 | USE SYNTHETIC LUBRICANT | $221 | $174 | Not Implemented |
AS0315 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,749 | $7,491 | Not Implemented |