IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0625 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $376 $476 Implemented
OK0625 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $2,642 $1,408 Not Implemented
OK0625 # 05 Y:2001 05 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $868 $230 Implemented
OK0625 # 06 Y:2001 06 2001 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $39,782 $95,000 Implemented
OK0625 # 07 Y:2001 07 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,200 $30,400 Implemented
OK0628 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $8,150 $310 Implemented
OK0628 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $357 $613 Implemented
OK0628 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,940 $3,013 Implemented
OK0628 # 04 Y:2001 04 2001 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,448 $1,500 Implemented
OK0628 # 05 Y:2001 05 2001 INCREASE AMOUNT OF CONDENSATE RETURNED $39,477 $20,922 Implemented
OK0628 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $75,988 $752 Implemented
OK0628 # 07 Y:2001 07 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,767 $5,653 Not Implemented
OK0628 # 08 Y:2001 08 2001 PREHEAT COMBUSTION AIR WITH WASTE HEAT $456,570 $93,000 Not Implemented
OK0628 # 09 Y:2001 09 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $5,452 $500 Not Implemented
OK0628 # 10 Y:2001 10 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,112 $100,000 Not Implemented
SU0123 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $347 $117 Implemented
SU0123 # 08 Y:2001 08 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $42 $3 Implemented
SU0123 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $196 Implemented
SU0123 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $0 Implemented
SU0123 # 04 Y:2001 04 2001 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,800 $0 Implemented
SU0123 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,325 $7,060 Implemented
SU0123 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,968 $694 Implemented
SU0123 # 01 Y:2001 01 2001 ELIMINATE SHIFT $13,517 $0 Not Implemented
AS0315 # 01 Y:2001 01 2001 USE SYNTHETIC LUBRICANT $221 $174 Not Implemented
AS0315 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,749 $7,491 Not Implemented