IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0241 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,721 $7,328 Not Implemented
MS0241 # 10 Y:2003 10 2003 INSTALL OCCUPANCY SENSORS $1,004 $416 Not Implemented
MS0241 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,854 $3,600 Implemented
MS0241 # 08 Y:2003 08 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,103 $1,102 Not Implemented
MS0241 # 07 Y:2003 07 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,613 $0 Implemented
NC0275 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,010 $4,120 Not Implemented
NC0275 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $455 $683 Implemented
NC0275 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,207 $4,563 Implemented
NC0275 # 03 Y:2003 03 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $12,088 $7,190 Not Implemented
NC0275 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,721 $63,800 Not Implemented
NC0275 # 01 Y:2003 01 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,058 $5,954 Not Implemented
OR0447 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,460 $880 Implemented
OR0447 # 03 Y:2003 03 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $28,720 $150 Implemented
OR0447 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $43,500 $4,910 Not Implemented
OR0447 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $105,200 $7,000 Implemented
OR0446 # 06 Y:2003 06 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,780 $26,000 Implemented
OR0446 # 05 Y:2003 05 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,050 $98,000 Not Implemented
OR0446 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,100 $13,000 Implemented
OR0446 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,800 $21,600 Implemented
OR0446 # 02 Y:2003 02 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,000 $8,100 Implemented
OR0446 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $508,000 $28,000 Not Implemented
UM0244 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,221 Not Implemented
UM0244 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,023 $521 Implemented
UM0244 # 04 Y:2003 04 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,499 $51,860 Not Implemented
UM0244 # 03 Y:2003 03 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $582 $2,477 Not Implemented