Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0131 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,225 $60 Not Implemented
TA0131 # 03 Y:2006 03 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,180 $630 Not Implemented
TA0131 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $120 Implemented
TA0131 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,400 $0 Implemented
TA0130 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,192 $0 Implemented
TA0130 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $81 $252 Implemented
TA0130 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $10,795 $22,000 Implemented
OR0511 # 09 Y:2006 09 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,400 $2,600 Not Implemented
OR0511 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,600 $5,000 Implemented
OR0511 # 07 Y:2006 07 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,800 $4,500 Not Implemented
OR0511 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,300 Implemented
OR0511 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,800 $0 Implemented
OR0511 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $14,400 $13,700 Implemented
OR0511 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $7,340 Not Implemented
OR0511 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $35,500 $8,000 Implemented
OR0511 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,200,000 $400,000 Implemented
UF0393 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $643 $0 Implemented
UF0393 # 08 Y:2006 08 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,457 $0 Not Implemented
UF0393 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,036 $27,664 Not Implemented
UF0393 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,990 $227 Implemented
UF0393 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,705 $62,192 Not Implemented
UF0393 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,417 $10,049 Not Implemented
UF0393 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,158 $1,938 Not Implemented
UF0393 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $24,700 $17,000 Not Implemented
UF0393 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,010 $71,812 Not Implemented