Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,425
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ1010 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $498 | $380 | n/a |
MZ1010 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $580 | $404 | n/a |
CI0041 # 01 Y:2024 | 01 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $349,950 | $1,386,072 | n/a |
CI0041 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,660 | $280,607 | n/a |
CI0041 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,870 | $5,200 | n/a |
CI0041 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,096 | $20,568 | n/a |
CI0041 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $17,211 | $5,150 | n/a |
CI0041 # 06 Y:2024 | 06 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $16,338 | $9,000 | n/a |
CI0041 # 07 Y:2024 | 07 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,571 | $40 | n/a |
CI0041 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,103 | $2,000 | n/a |
CI0041 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,157 | $2,000 | n/a |
UD1103 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $11,529 | $28,000 | n/a |
UD1103 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,186 | $3,750 | n/a |
UD1103 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,580 | $273,000 | n/a |
UD1103 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $356 | $110 | n/a |
UD1103 # 05 Y:2025 | 05 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $6,351 | $81,000 | n/a |
UF0626 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,710 | $322,608 | n/a |
UF0626 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $41,281 | $36,971 | n/a |
UF0626 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,328 | $1,140 | n/a |
UF0626 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,036 | $15,920 | n/a |
UF0626 # 05 Y:2024 | 05 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,655 | $12,290 | n/a |
UF0626 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,871 | $0 | n/a |
UF0626 # 07 Y:2024 | 07 | 2024 | REDESIGN PROCESS | $1,168 | $4,600 | n/a |
UF0626 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,107 | $280 | n/a |
UF0626 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,600 | $740 | n/a |