Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,443
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0546 # 04 Y:2000 | 04 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,500 | $1,000 | Implemented |
KU0546 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $870 | $740 | Implemented |
KU0543 # 01 Y:2000 | 01 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $27,200 | $0 | Implemented |
KU0543 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,020 | $50,000 | Not Implemented |
KU0543 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $430 | $450 | Not Implemented |
KU0543 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $430 | $50 | Implemented |
KU0543 # 05 Y:2000 | 05 | 2000 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $420 | $100 | Implemented |
KU0543 # 06 Y:2000 | 06 | 2000 | ELIMINATE A BY-PRODUCT | $7,940 | $9,680 | Not Implemented |
KU0543 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,630 | $8,000 | Not Implemented |
KU0543 # 08 Y:2000 | 08 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $56,920 | $70,000 | Not Implemented |
IA0252 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,486 | $2,487 | Not Implemented |
IA0252 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,923 | $1,921 | Implemented |
IA0252 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,422 | $1,421 | Implemented |
IA0252 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,856 | $2,855 | Implemented |
IA0252 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,132 | $2,132 | Implemented |
IA0252 # 06 Y:2000 | 06 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $909 | $775 | Implemented |
IA0252 # 07 Y:2000 | 07 | 2000 | INSTALL OCCUPANCY SENSORS | $488 | $488 | Not Implemented |
IA0252 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $649 | $374 | Implemented |
IA0252 # 09 Y:2000 | 09 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $617 | $617 | Not Implemented |
IA0252 # 10 Y:2000 | 10 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $88,850 | $88,849 | Not Implemented |
IA0252 # 11 Y:2000 | 11 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $2,101 | $2,101 | Not Implemented |
IA0249 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,706 | $127 | Not Implemented |
IA0249 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,482 | $25 | Not Implemented |
IA0249 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $854 | $38 | Implemented |
IA0249 # 04 Y:2000 | 04 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,223 | $0 | Implemented |