IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,224

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0662 # 01 Y:1999 01 1999 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $55,900 $90,000 Not Implemented
TN0662 # 02 Y:1999 02 1999 MODIFY CURRENT INCENTIVE PROGRAM $45,000 $30,000 Implemented
TN0662 # 03 Y:1999 03 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,380 $4,260 Not Implemented
TN0662 # 04 Y:1999 04 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,050 $19,800 Implemented
TN0662 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,010 $1,460 Implemented
TN0662 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $970 $2,225 Not Implemented
TN0660 # 01 Y:1999 01 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $56,525 $880 Implemented
TN0660 # 02 Y:1999 02 1999 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $20,100 $50,000 Implemented
TN0660 # 03 Y:1999 03 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,247 $4,700 Implemented
TN0660 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,450 $0 Not Implemented
TN0660 # 05 Y:1999 05 1999 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,360 $1,070 Implemented
TN0660 # 06 Y:1999 06 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,300 $8,200 Implemented
TN0638 # 01 Y:1998 01 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $580,000 $27,200 Implemented
TN0638 # 02 Y:1998 02 1998 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $88,890 $200,000 Not Implemented
TN0638 # 03 Y:1998 03 1998 MAKE A NEW BY-PRODUCT $17,500 $68,200 Not Implemented
TN0638 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,990 $0 Implemented
TN0638 # 05 Y:1998 05 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $7,220 $6,550 Implemented
TN0638 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $920 $560 Implemented
TN0638 # 07 Y:1998 07 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $120 $390 Implemented
GT0636 # 01 Y:1998 01 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $49,000 $0 Not Implemented
GT0636 # 02 Y:1998 02 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,227 $0 Not Implemented
GT0636 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,388 $150 Not Implemented
GT0636 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $4,740 Not Implemented
GT0636 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,095 $0 Not Implemented
GT0636 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,075 $0 Not Implemented