Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1805 # 04 Y:2018 | 04 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,147 | $1,316 | n/a |
UK1805 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $409 | $570 | n/a |
UK1805 # 06 Y:2018 | 06 | 2018 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $495 | $1,250 | n/a |
UK1805 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $338 | $365 | n/a |
UK1805 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,637 | $750 | n/a |
UK1805 # 09 Y:2018 | 09 | 2018 | MOVE PRODUCT USING MECHANICAL MEANS | $27,500 | $19,000 | n/a |
BS0112 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,983 | $1,500 | Not Implemented |
BS0112 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,971 | $2,145 | Not Implemented |
BS0112 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,787 | $13,000 | Not Implemented |
BS0112 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,785 | $1,560 | Not Implemented |
BS0112 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,656 | $1,031 | Not Implemented |
BS0112 # 06 Y:2018 | 06 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,051 | $2,790 | Not Implemented |
NL0025 # 01 Y:2018 | 01 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,194 | $15,000 | Not Implemented |
NL0025 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,388 | $45,275 | Implemented |
NL0025 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,651 | $1,575 | Implemented |
NL0025 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $914 | $1,600 | Implemented |
OR0706 # 01 Y:2018 | 01 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $12,552 | $1,970 | Implemented |
OR0706 # 02 Y:2018 | 02 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,952 | $28,542 | Not Implemented |
OR0706 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,311 | $2,097 | Not Implemented |
OR0706 # 04 Y:2018 | 04 | 2018 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,000 | $24,775 | Implemented |
OR0706 # 05 Y:2018 | 05 | 2018 | REDUCE FLUID FLOW RATES | $1,821 | $3,221 | Not Implemented |
OR0706 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $854 | $0 | Implemented |
SD0571 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $35,866 | $178,055 | Not Implemented |
SD0571 # 02 Y:2018 | 02 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $20,104 | $28,000 | Not Implemented |
SD0571 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $3,128 | $939 | Not Implemented |