IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1911 # 06 Y:2019 06 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,615 $7,400 Not Implemented
UK1911 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,750 $0 Not Implemented
UK1911 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $26,686 $9,826 Not Implemented
UA0216 # 01 Y:2019 01 2019 CONVERT TO OXYFUEL BURNERS $683,991 $1,000,000 Not Implemented
UA0216 # 02 Y:2019 02 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,963 $927 Not Implemented
UA0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $67,295 $83,671 Not Implemented
UA0216 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,565 $163,736 Not Implemented
UA0216 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,592 $9,552 Not Implemented
UA0216 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,527 $8,775 Not Implemented
UA0216 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,010 $50 Not Implemented
LS1915 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $33 Not Implemented
LS1915 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $99 $25 Not Implemented
LS1915 # 03 Y:2019 03 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $607 $450 Not Implemented
LS1915 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,228 $1,974 Implemented
LS1915 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,568 $12,000 Not Implemented
LS1915 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $109 $258 Not Implemented
AM0787 # 01 Y:2019 01 2019 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $290,927 $1,011,274 Not Implemented
AM0787 # 02 Y:2019 02 2019 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $312,044 $849,614 Not Implemented
AM0787 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $56,595 $10,440 Implemented
AM0787 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $13,271 $14,560 Implemented
AM0787 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $70,814 $178,864 Implemented
AM0787 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,322 $825 Implemented
AM0787 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,577 $2,640 Implemented
AM0787 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $399 $280 Not Implemented
WM0141 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,547 $16,000 Not Implemented