IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0507 # 03 Y:1996 03 1996 USE MINIMUM SAFE OVEN VENTILATION $1,228 $5,000 Implemented
UD0507 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $833 $3,271 Not Implemented
UD0508 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $7,200 $60,000 Implemented
UD0508 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $2,314 Implemented
UD0508 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,041 $8,081 Implemented
UD0508 # 04 Y:1996 04 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $31,719 $11,000 Implemented
UD0508 # 05 Y:1996 05 1996 ELIMINATE/REDUCE AN OPERATION $9,650 $5,000 Not Implemented
UD0508 # 06 Y:1996 06 1996 ELIMINATE/REDUCE AN OPERATION $8,523 $0 Implemented
UD0508 # 07 Y:1996 07 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $101,584 $40,000 Implemented
UD0508 # 08 Y:1996 08 1996 INSTALL AN UNINTERUPTABLE POWER SUPPLY $135,600 $222,868 Implemented
UD0508 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,158 $2,286 Implemented
UD0508 # 10 Y:1996 10 1996 RECOVER AND REUSE COOLING WATER $5,108 $5,000 Implemented
UD0506 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $11,388 $8,000 Implemented
UD0506 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,091 $0 Implemented
UD0506 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,416 $31,170 Implemented
UD0506 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,316 $41,520 Implemented
UD0505 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $12,351 $9,000 Implemented
UD0505 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,214 $0 Implemented
UD0505 # 03 Y:1996 03 1996 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $8,648 $4,000 Implemented
UD0505 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,221 $500 Implemented
UD0505 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $4,110 $6,000 Implemented
UD0505 # 06 Y:1996 06 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,448 $1,000 Implemented
UD0505 # 07 Y:1996 07 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,640 $0 Implemented
UD0504 # 01 Y:1996 01 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,379 $1,500 Implemented
UD0504 # 02 Y:1996 02 1996 RECOVER WASTE HEAT FROM EQUIPMENT $54,934 $80,000 Implemented