Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,739
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0245 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $114 | $113 | Implemented |
IA0245 # 07 Y:2000 | 07 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $97,398 | $100,000 | Implemented |
IA0245 # 08 Y:2000 | 08 | 2000 | USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY | $1,500 | $6,500 | Not Implemented |
IA0245 # 09 Y:2000 | 09 | 2000 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $173 | $0 | Not Implemented |
DS0166 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,974 | $251 | Implemented |
DS0166 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,511 | $500 | Implemented |
DS0166 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,561 | $21,339 | Not Implemented |
DS0166 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $970 | $648 | Not Implemented |
DS0166 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $2,134 | $1,750 | Not Implemented |
DS0166 # 06 Y:2000 | 06 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $688 | $0 | Not Implemented |
DS0166 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,174 | $4,000 | Not Implemented |
DS0166 # 08 Y:2000 | 08 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,210 | $80,000 | Implemented |
DS0166 # 09 Y:2000 | 09 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $1,440 | $1,175 | Not Implemented |
DS0166 # 10 Y:2000 | 10 | 2000 | $16,522 | $4,316 | Not Implemented | |
DS0165 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,045 | $12,005 | Implemented |
DS0165 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $535 | $432 | Not Implemented |
DS0165 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM THICKNESS INSULATION | $494 | $275 | Not Implemented |
DS0165 # 04 Y:2000 | 04 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,267 | $42,720 | Not Implemented |
DS0165 # 05 Y:2000 | 05 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $19,293 | $4,085 | Not Implemented |
DS0165 # 06 Y:2000 | 06 | 2000 | BURN WASTE OIL FOR HEAT | $4,893 | $3,695 | Not Implemented |
DS0165 # 07 Y:2000 | 07 | 2000 | SELL COMBUSTIBLE WASTE | $22,432 | $900 | Not Implemented |
DS0165 # 08 Y:2000 | 08 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $51,099 | $94,300 | Not Implemented |
DS0165 # 09 Y:2000 | 09 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $6,793 | $1,634 | Not Implemented |
DS0163 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $447 | $44 | Not Implemented |
DS0163 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $301 | $560 | Not Implemented |