Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0534 # 07 Y:2008 | 07 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $127 | $125 | Not Implemented |
OR0534 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $1,219 | $2,510 | Implemented |
OR0534 # 09 Y:2008 | 09 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $829 | $2,700 | Not Implemented |
OR0534 # 10 Y:2008 | 10 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $447 | $808 | Implemented |
CO0615 # 01 Y:2008 | 01 | 2008 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,560 | $12,000 | Not Implemented |
CO0615 # 02 Y:2008 | 02 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,490 | $1,000 | Implemented |
CO0615 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,960 | $1,500 | Implemented |
CO0615 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,280 | $13,730 | Not Implemented |
CO0615 # 05 Y:2008 | 05 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,930 | $11,000 | Not Implemented |
UM0342 # 01 Y:2008 | 01 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,661 | $7,350 | Not Implemented |
UM0342 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,313 | $7,500 | Implemented |
UM0342 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,736 | $13,776 | Not Implemented |
UM0342 # 04 Y:2008 | 04 | 2008 | REDUCE VENTILATION AIR | $2,824 | $1,228 | Not Implemented |
UM0342 # 05 Y:2008 | 05 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,462 | $515 | Not Implemented |
UM0342 # 06 Y:2008 | 06 | 2008 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,437 | $0 | Not Implemented |
UM0342 # 07 Y:2008 | 07 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $798 | $638 | Implemented |
BD0348 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,613 | $24,066 | Not Implemented |
BD0348 # 02 Y:2008 | 02 | 2008 | INSTALL OCCUPANCY SENSORS | $1,392 | $2,026 | Not Implemented |
BD0348 # 03 Y:2008 | 03 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,758 | $2,001 | Not Implemented |
BD0348 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,081 | $2 | Not Implemented |
BD0348 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $142,941 | $1,401 | Not Implemented |
BD0348 # 06 Y:2008 | 06 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $7,689 | $5,001 | Not Implemented |
BD0348 # 07 Y:2008 | 07 | 2008 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $50,882 | $42,001 | Not Implemented |
BD0348 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,743 | $7,844 | Not Implemented |
BD0348 # 09 Y:2008 | 09 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $54,402 | $12,001 | Not Implemented |