Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0349 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $457 | $216 | Not Implemented |
SU0349 # 05 Y:2013 | 05 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $882,762 | $552,244 | Not Implemented |
SU0349 # 06 Y:2013 | 06 | 2013 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $361,538 | $453,062 | Not Implemented |
SU0349 # 07 Y:2013 | 07 | 2013 | ELIMINATE/REDUCE AN OPERATION | $2,724 | $5,760 | Not Implemented |
SU0349 # 08 Y:2013 | 08 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $3,201 | $8,460 | Implemented |
SF0440 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $212,131 | $19,224 | Implemented |
SF0440 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $4,352 | $6,354 | Implemented |
SF0440 # 03 Y:2013 | 03 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $10,575 | $16,520 | Implemented |
SF0440 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,854 | $11,795 | Implemented |
SF0440 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,122 | $41,610 | Implemented |
SF0440 # 06 Y:2013 | 06 | 2013 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $40,388 | $27,000 | Implemented |
SF0440 # 07 Y:2013 | 07 | 2013 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $17,219 | $50,025 | Not Implemented |
SF0440 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $11,533 | $66,403 | Implemented |
SF0440 # 09 Y:2013 | 09 | 2013 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,324 | $12,624 | Not Implemented |
BD0432 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $9,498 | $14,512 | Not Implemented |
BD0432 # 02 Y:2013 | 02 | 2013 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $6,185 | $16,000 | Not Implemented |
BD0432 # 03 Y:2013 | 03 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,832 | $4,800 | Not Implemented |
BD0432 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,312 | $500 | Not Implemented |
BD0432 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $793 | $2,777 | Not Implemented |
BD0432 # 06 Y:2013 | 06 | 2013 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $212 | $40 | Not Implemented |
BD0432 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $378 | $20 | Not Implemented |
CO0678 # 01 Y:2013 | 01 | 2013 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,330 | $14,900 | Not Implemented |
CO0678 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $200 | Implemented |
CO0678 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,340 | $8,100 | Not Implemented |
CO0678 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $890 | $350 | Not Implemented |