IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0532 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,119 $460 Not Implemented
LE0532 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,393 $5,160 Not Implemented
LE0532 # 04 Y:2022 04 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,125 $80,000 Not Implemented
LE0532 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,896 $15,000 Not Implemented
LE0532 # 06 Y:2022 06 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,155 $99,432 Not Implemented
LE0532 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,992 $200,000 Not Implemented
MZ0328 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $57,088 $235,000 Not Implemented
MZ0328 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,047 $7,500 Not Implemented
MZ0328 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,438 $2,450 Not Implemented
MZ0328 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $302 $120 Not Implemented
MU0008 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $263 $210 Not Implemented
MU0008 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,317 $2,520 Implemented
MU0008 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $168 $0 Implemented
MU0008 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,790 $580 Not Implemented
MU0008 # 05 Y:2022 05 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $11,502 $0 Not Implemented
SU0515 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,532 $95 Implemented
SU0515 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $531 $95 Implemented
SU0515 # 03 Y:2022 03 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,214 $657 Not Implemented
SU0515 # 04 Y:2022 04 2022 ELIMINATE/REDUCE AN OPERATION $1,896 $1,442 Not Implemented
SU0515 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45 $56 Not Implemented
SU0515 # 06 Y:2022 06 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $142 $189 Not Implemented
SU0515 # 07 Y:2022 07 2022 REDUCE VENTILATION AIR $1,768 $2,413 Not Implemented
SU0515 # 08 Y:2022 08 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $167 $432 Not Implemented
SU0515 # 09 Y:2022 09 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,236 $23,260 Implemented
MA0844 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $9,380 $10,000 Not Implemented