IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122,146

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0499 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $3,164 $1,617 Not Implemented
NC0499 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,539 $1,165 Not Implemented
NC0499 # 07 Y:2013 07 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,306 $1,750 Implemented
NC0499 # 08 Y:2013 08 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,104 $200 Not Implemented
NC0499 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,448 $18,119 Implemented
NC0499 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,040 $12,800 Implemented
NC0499 # 11 Y:2013 11 2013 INSTALL OCCUPANCY SENSORS $3,113 $3,202 Not Implemented
NC0499 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,194 $451 Implemented
NC0499 # 13 Y:2013 13 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $100 Implemented
NC0499 # 14 Y:2013 14 2013 DEVELOP A REPAIR/REPLACE POLICY $2,055 $4,256 Implemented
BD0432 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $9,498 $14,512 Not Implemented
SF0440 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $212,131 $19,224 Implemented
SF0440 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $4,352 $6,354 Implemented
SF0440 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $10,575 $16,520 Implemented
SF0440 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,854 $11,795 Implemented
SF0440 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,122 $41,610 Implemented
SF0440 # 06 Y:2013 06 2013 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $40,388 $27,000 Implemented
SF0440 # 07 Y:2013 07 2013 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $17,219 $50,025 Not Implemented
SF0440 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $11,533 $66,403 Implemented
SF0440 # 09 Y:2013 09 2013 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,324 $12,624 Not Implemented
IA0511 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $3,687 $4,550 Not Implemented
IA0511 # 02 Y:2013 02 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,147 $3,500 Not Implemented
IA0511 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,410 $950 Implemented
IA0511 # 04 Y:2013 04 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $466 $1,291 Implemented
IA0511 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $186 $35 Implemented