IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1021 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,283 $0 Implemented
UD1021 # 02 Y:2020 02 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $32,724 $0 Implemented
UD1021 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,965 $1,400 Not Implemented
UD1021 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,342 $0 Implemented
UD1021 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,841 $0 Implemented
UD1021 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,902 $2,000 Implemented
UD1021 # 07 Y:2020 07 2020 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,594 $1,590 Not Implemented
UD1021 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,419 $37,053 Implemented
UD1021 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $16,106 $2,800 Implemented
UD1021 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,902 $7,800 Not Implemented
UD1021 # 11 Y:2020 11 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $249 $240 Not Implemented
UF0554 # 01 Y:2020 01 2020 Install Anaerobic Digester $74,732 $250,000 Not Implemented
UF0554 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,805 $25,232 Implemented
UF0554 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $6,420 $17,086 Implemented
UF0554 # 04 Y:2020 04 2020 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $9,363 $0 Implemented
UF0554 # 05 Y:2020 05 2020 INSTALL SENSORS TO DETECT DEFECTS $3,851 $15,420 Implemented
UF0554 # 06 Y:2020 06 2020 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,206 $6,500 Implemented
UF0554 # 07 Y:2020 07 2020 USE RE-USABLE FILTERS $3,000 $1,906 Implemented
UF0553 # 01 Y:2020 01 2020 AUTOMATE FINISHING PROCESS $20,196 $46,226 Not Implemented
UF0553 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,460 $28,443 Implemented
UF0553 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,490 $5,608 Implemented
UF0553 # 04 Y:2020 04 2020 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $395,494 $1,875,550 Not Implemented
UF0553 # 05 Y:2020 05 2020 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $2,236 $0 Implemented
SF0558 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,941 $0 Implemented
SF0558 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $98,999 $34,416 Implemented