IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,544

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0840 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,239 $3,220 Not Implemented
UU0202 # 01 Y:2022 01 2022 BURN A LESS EXPENSIVE GRADE OF FUEL $459,131 $54,000 Implemented
UU0202 # 02 Y:2022 02 2022 INCREASE USE OF AUTOMATION $160,040 $264,000 Implemented
UU0202 # 03 Y:2022 03 2022 INCREASE USE OF AUTOMATION $47,100 $168,000 Not Implemented
UU0202 # 04 Y:2022 04 2022 INCREASE USE OF AUTOMATION $37,811 $120,000 Not Implemented
UU0202 # 05 Y:2022 05 2022 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $1,106,201 $6,569,770 Not Implemented
UU0202 # 06 Y:2022 06 2022 REPAIR OR REPLACE STEAM TRAPS $110,091 $24,076 Implemented
UU0202 # 07 Y:2022 07 2022 PAY UTILITY BILLS ON TIME $19,227 $200 Not Implemented
LE0527 # 01 Y:2022 01 2022 PAY BILLS ON TIME TO AVOID LATE FEES $1,805 $0 Implemented
LE0527 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $103 $40 Not Implemented
LE0527 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,621 $1,330 Implemented
LE0527 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,500 $3,435 Implemented
LE0527 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,527 $500,000 Implemented
LE0527 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,260 $8,500 Not Implemented
LE0527 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,154 $160,000 Implemented
UD1043 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,844 $0 Not Implemented
UD1043 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,705 $30,000 Not Implemented
UD1043 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $540 $0 Not Implemented
UD1043 # 04 Y:2022 04 2022 ELIMINATE/REDUCE AN OPERATION $213 $0 Not Implemented
UD1043 # 05 Y:2022 05 2022 USE HEAT PUMP FOR SPACE CONDITIONING $18,707 $62,108 Not Implemented
UF0581 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $74,168 $293,280 Not Implemented
UF0581 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,084 $4,202 Implemented
UF0581 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,046 $5,794 Implemented
UF0581 # 04 Y:2022 04 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,091 $8,250 Implemented
UF0581 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $11,526 $10,000 Implemented