Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1017 # 06 Y:2020 | 06 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $955 | $0 | Not Implemented |
UD1017 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $25,311 | $31,200 | Not Implemented |
UD1017 # 08 Y:2020 | 08 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,360 | $16,720 | Not Implemented |
CW0113 # 01 Y:2020 | 01 | 2020 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $3,565 | $1,858 | Implemented |
CW0113 # 02 Y:2020 | 02 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $104,454 | $200,550 | Not Implemented |
CW0113 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $941 | $105 | Implemented |
CW0113 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $810 | Not Implemented |
CW0113 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $1,600 | Implemented |
CW0113 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $13,673 | $2,250 | Not Implemented |
CW0113 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,683 | $10,280 | Implemented |
CW0113 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $3,092 | $1,969 | Not Implemented |
CW0112 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,912 | $330 | Implemented |
CW0112 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,658 | $100 | Implemented |
CW0112 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,643 | $848 | Not Implemented |
CW0112 # 04 Y:2020 | 04 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,678 | $800 | Implemented |
CW0112 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,268 | $3,429 | Not Implemented |
CW0112 # 06 Y:2020 | 06 | 2020 | TREAT AND REUSE RINSE WATERS | $15,861 | $10,000 | Implemented |
CW0112 # 07 Y:2020 | 07 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,966 | $800 | Implemented |
CW0112 # 08 Y:2020 | 08 | 2020 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $7,871 | $14,588 | Not Implemented |
CW0112 # 09 Y:2020 | 09 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $51,045 | $2,000 | Implemented |
CW0112 # 10 Y:2020 | 10 | 2020 | INCREASE USE OF AUTOMATION | $749,435 | $60,000 | Implemented |
CW0112 # 11 Y:2020 | 11 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,024 | $6,471 | Not Implemented |
CW0112 # 12 Y:2020 | 12 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $342 | $0 | Implemented |
CW0112 # 13 Y:2020 | 13 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,095 | $16,500 | Implemented |
UD1016 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $85 | $0 | Not Implemented |