IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0213 # 07 Y:1999 07 1999 CHANGE OPERATING CONDITIONS $899 $1,040 Not Implemented
HO0213 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $5,887 $4,200 Not Implemented
HO0213 # 09 Y:1999 09 1999 USE A RAG RECYCLE SERVICE $425 $0 Not Implemented
MA0449 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $69,817 $255,600 Not Implemented
MA0449 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,001 $12,150 Implemented
MA0449 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,594 $24,400 Not Implemented
MA0449 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,481 $24,400 Not Implemented
MA0449 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,304 $6,042 Not Implemented
MA0449 # 06 Y:1999 06 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,706 $2,000 Implemented
MA0449 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $594 $0 Not Implemented
MA0450 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $75,618 $250,000 Not Implemented
MA0450 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,042 $1,000 Implemented
MA0450 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,892 $5,813 Implemented
MA0450 # 04 Y:1999 04 1999 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $456 $1,275 Not Implemented
MA0450 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,423 $5,216 Implemented
MA0450 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $537 $0 Implemented
OK0585 # 01 Y:1999 01 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,155 $2,668 n/a
OK0585 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $-1,464 $4,300 n/a
OK0585 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,788 $0 n/a
OK0585 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,121 $1,162 n/a
OK0585 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $360 n/a
OK0585 # 06 Y:1999 06 1999 INSTALL SET-BACK TIMERS $507 $260 n/a
OK0585 # 07 Y:1999 07 1999 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $45,623 $17,000 n/a
OK0585 # 08 Y:1999 08 1999 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $147,498 $25,000 n/a
OK0585 # 09 Y:1999 09 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,045 $0 n/a