Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2314 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,655 | $1,283 | n/a |
UC2314 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,943 | $21,500 | n/a |
UC2314 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $2,702 | $800 | n/a |
UC2314 # 06 Y:2023 | 06 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $627 | $1,061 | n/a |
UC2314 # 07 Y:2023 | 07 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,082 | $1,674 | n/a |
UC2314 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,033 | $0 | n/a |
UC2314 # 09 Y:2023 | 09 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $14,221 | $0 | n/a |
UC2314 # 10 Y:2023 | 10 | 2023 | REPLACE BOILER | $8,265 | $39,281 | n/a |
UC2314 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $197,753 | $1,537,591 | n/a |
UC2314 # 12 Y:2023 | 12 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $26,966 | $395,108 | n/a |
UC2314 # 13 Y:2023 | 13 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $24,735 | $170,000 | n/a |
UC2314 # 14 Y:2023 | 14 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,261 | $34,348 | n/a |
UC2314 # 15 Y:2023 | 15 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,312 | $39,269 | n/a |
SU0539 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $1,626 | $0 | n/a |
SU0539 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $10,262 | $5,600 | n/a |
SU0539 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,866 | $1,925 | n/a |
SU0539 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,490 | $11,867 | n/a |
UW2316 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $705 | $2,080 | Implemented |
UW2316 # 02 Y:2023 | 02 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $73,471 | $88,000 | Implemented |
UW2316 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,897 | $192,325 | Not Implemented |
LS2319 # 01 Y:2023 | 01 | 2023 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $12,150 | $0 | Not Implemented |
LS2319 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $50 | Not Implemented |
LS2319 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $1,365 | Not Implemented |
LS2319 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $307 | $230 | Implemented |
LS2319 # 05 Y:2023 | 05 | 2023 | USE OTHER WASTE CONCENTRATION METHODS | $34,000 | $200,000 | Not Implemented |