IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,821

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0780 # 03 Y:2023 03 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,453 $14,157 Not Implemented
OR0780 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,666 $24,285 Not Implemented
ORC011 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,565 $11,700 n/a
ORC011 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $494 $2,500 n/a
ORC011 # 03 Y:2023 03 2023 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $6,882 $0 n/a
ORC011 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $117 $500 n/a
UW2314 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,331 $2,251 Not Implemented
UW2314 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $701 $3,150 Implemented
UW2314 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $96 $180 Implemented
UF0601 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,858,540 $0 Not Implemented
UF0601 # 02 Y:2023 02 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,202,647 $3,920,000 Implemented
UF0601 # 03 Y:2023 03 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $280,640 $30,000 Implemented
UF0601 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $32,141 $49,680 Implemented
UF0601 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,983 $0 Implemented
UF0601 # 06 Y:2023 06 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $74,558 $0 Implemented
UF0601 # 07 Y:2023 07 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $61,813 $29,295 Implemented
UF0601 # 08 Y:2023 08 2023 IMPROVE SPACE COMFORT CONDITIONING $34,014 $3,179 Implemented
UL2310 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $145,022 $23,878 n/a
UL2310 # 02 Y:2023 02 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,283 $0 n/a
UL2310 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $159,497 $1,065,693 n/a
UL2310 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,462 $0 n/a
UL2310 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,694 $540 n/a
UL2310 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $550 $2,438 n/a
LS1723 # 01 Y:2023 01 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $12,310 $0 Implemented
LS1723 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,341 $0 Implemented