Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
143,748
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2313 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $251 | $50 | n/a |
UC2313 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $75 | n/a |
UC2313 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,884 | $16,157 | n/a |
UC2313 # 09 Y:2023 | 09 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $4,673 | $19,488 | n/a |
UC2313 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $615 | $1,053 | n/a |
LS2318 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,605 | $90 | Implemented |
LS2318 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,425 | $372 | Implemented |
LS2318 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $14,825 | $3,000 | Not Implemented |
LS2318 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,311 | $43,200 | Implemented |
OR0778 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,119 | $0 | Not Implemented |
OR0778 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,178 | $0 | Not Implemented |
OR0778 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,010 | $8,010 | Not Implemented |
AS0563 # 02 Y:2023 | 02 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $20,707 | $53,376 | Not Implemented |
AS0563 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,261 | $14,447 | Implemented |
AS0563 # 04 Y:2023 | 04 | 2023 | ADJUST BURNERS FOR EFFICIENT OPERATION | $4,800 | $481 | Implemented |
AS0563 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $3,177 | $4,584 | Not Implemented |
AS0563 # 06 Y:2023 | 06 | 2023 | INSTALL SPECTRAL REFLECTORS / DELAMP | $651 | $106 | Not Implemented |
AS0563 # 01 Y:2023 | 01 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $24,380 | $2,114 | Implemented |
DL0229 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $61,397 | $0 | Not Implemented |
DL0229 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $32,353 | $0 | Implemented |
DL0229 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $8,303 | $0 | Not Implemented |
DL0229 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $44,923 | $1,275 | Not Implemented |
DL0229 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,948 | $14,000 | Not Implemented |
DL0229 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $104,868 | $500,000 | Not Implemented |
NT0017 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $50,287 | $1,258 | Not Implemented |