IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,553

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0393 # 01 Y:1997 01 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $92,750 $68,000 Implemented
MA0393 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $8,750 $1,000 Implemented
MA0393 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $2,550 $356 Implemented
MA0393 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,895 $10 Implemented
MA0393 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $160 $0 Implemented
MA0393 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $147 $0 Implemented
MA0392 # 01 Y:1997 01 1997 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $34,500 $21,950 Implemented
MA0392 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,500 $3,000 Not Implemented
MA0392 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,388 $6,000 Not Implemented
MA0392 # 04 Y:1997 04 1997 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $320 $268 Implemented
MA0392 # 05 Y:1997 05 1997 CONVERT TO AQUEOUS CLEANING $276 $759 Implemented
MA0387 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,170 $8,401 Not Implemented
MA0387 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,430 $1,230 Implemented
MA0387 # 03 Y:1997 03 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,453 $5,640 Not Implemented
MA0387 # 04 Y:1997 04 1997 PAY BILLS ON TIME TO AVOID LATE FEES $3,251 $0 Implemented
MA0387 # 05 Y:1997 05 1997 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,662 $21,410 Not Implemented
MA0380 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,018 $5,000 Implemented
MA0380 # 02 Y:1996 02 1996 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $1,037 $360 Not Implemented
MA0380 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $686 $1,040 Not Implemented
MA0380 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $616 $885 Implemented
MA0380 # 05 Y:1996 05 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $503 $229 Not Implemented
MA0359 # 01 Y:1996 01 1996 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $9,520 $17,800 Not Implemented
MA0359 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,359 $13,344 Not Implemented
MA0359 # 03 Y:1996 03 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,436 $6,000 Not Implemented
MA0359 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $933 $1,440 Not Implemented